This project was constructed in a remote location with the only access during construction being a previous gravel haul road which was later converted to the main access road requiring access and materials delivery coordination on a daily basis. This facility required showers for up to 800 workers and involved tying the new building to an elevator that conveyed workers 1800 feet below the surface via a 330-foot conditioned corridor. This project involved adherence to MSHA safety guidelines, extensive PPE and training.
Raven, Virginia
31,128
Industry / Warehouse